G r e e n w a y  C o r r i d o r   B e r l i n   S u e d p a n k e

Invited competition
1st prize   11/07

Client: Senate Department for Urban Development Berlin
represented by Grün Berlin Park and Garden GmbH

Context

 



The South Panke Corridor connects the Invaliden Park with the South Panke Park. Cutting through block 604, it brushes against public open spaces as it crosses the Habersaathstrasse, Planstrasse and Chausseestrasse.

The planned area is an elongated corridor made up of different sections of varying lengths and widths. A characteristic copse of poplars, maples and black locust trees runs alog the western edge of the corridor. The wooded border marks the course of the corridor by creating a recognizable spatial contour.
 
Panke’s course
and riverside
pathway


The course of the River Panke forms the backbone of the greenway. Its continuously flowing linearity is understood as the main connecting feature that allows for individual orientation and positioning within the open green space. At the same time, the Panke slightly changes course at several points, articulating multiple sections along the river, which offer changing perspectives on the surrounding environment.

Encouraging the visitor to experience these described spatial effects, the riverside path is aligned parallel to the main path. The upper edge of the riverside path is slightly above the water level.
Sunny and
shady sides
Entry Areas


The course of the Panke’s flow creates niches on both sides of the river. The two areas are distinguished by their bank formations, tree linings, and different light and shade exposures.

Four entry areas make up the entreé to the open green space. The Panke and accompanying riverside path are embedded in the entrance areas, which are not dependent on the main square. The riverbed widens at the entrance areas. Descending a ramp and generous progression of steps, cyclists and pedestrians finally reach the river’s edge at water level.
Data

Site Size: 2.8 ha

Design and Construction Planning: 2008/09
Realisation: 1st phase 2010/11

Building Phases: 2-5+8 (construction supervision)

Client:Senate Department for Urban Development Berlin
represented by Grün Berlin Park and Garden GmbH

Realisation with:
Grigoleit Landschaftsarchitektur Umweltplanung

Construction Costs:1st phase 1.6 Mio EUR brutto

Competition:
Ulrike Böhm, Cyrus Zahiri, Katja Benfer,
Tim Wildner, Anna Vogels Ann-Kristin Haeger
Christina Bös, Karoline Kostka, Matthias Gaissmayer

Planning:
Ulrike Böhm, Cyrus Zahiri, Katja Benfer,
Anna Vogels, Anne Wex, Mirjam Sauer, Matthias Sachse,
Alexandra Blechschmidt, Irene Winterstein, Tim Wildner

bbzl
boehm benfer zahiri
landscapes urban design

www.bbzl.de